Skip to main content
Back to voting

Refurbishment of Harbour Front Square

Non-binding citizen vote. Decide whether Harbour Front Square should be remodelled and, if so, which of the two finalist designs should go ahead.

  • 11. Sustainable Cities and Communities
  • target 11.7
You must sign in or sign up to participate.
Do you consider it necessary to remodel the square?
Which of the two finalist projects do you prefer to be carried out?

More information

Harbour Front Square sits between the old town and the waterfront path.
It has strong public-transport access but is currently mostly hardstanding,
with little shade, seating, or space for events.


This vote closes the participatory process: first whether to remodel,
then which finalist project to carry out. Results are advisory for the
council.

Which of the two finalist projects do you prefer to be carried out?

Light on the Water

Light on the Water creates an open civic square with wide paving bands, a simple stage edge, native planting, and a clear link from the bus stop to the waterfront path.

Designed as an integrator: park, town and transport, with flexible space for events and everyday use.

Square with Story

Square with Story keeps more of the existing layout and adds a small covered market pavilion, a play/exercise edge, and heritage interpretation.

Stronger built programme (market + flexible rooms) while improving accessible routes across the square.