Skip to main content
Back to voting

Coastal Path upgrade — which route design?

Non-binding vote on one funded stretch of coastal path: whether to upgrade now, and which design package to build first.

  • 3. Good Health and Well-Being
  • 11. Sustainable Cities and Communities
  • 13. Climate Action
  • 15. Life on Land
You must sign in or sign up to participate.
Do you support upgrading this stretch now?
Which design package should be delivered?

More information

The path between the harbour and the campsite is heavily used but narrow,
poorly lit in winter, and flooded at one pinch point.


Both packages improve accessibility; they differ on lighting, surfacing
and habitat treatment.

Which design package should be delivered?

Soft Edge Path

Bound gravel plus boardwalk over the wet section, low ecological lighting, seating nodes and wildflower margins. Quieter, nature-led.

All-Weather Link

Fully sealed shared-use path (walk/cycle), brighter lighting, clearer wayfinding and a small viewing platform. Better for year-round commuting.